Refractory engineering and design for turnarounds and plant maintenance
BP Refinery – Bulwer Island
The role of Palmer Technologies is to provide independent technical advice to BP Refinery specifically to prepare –
Technical advice on civil concrete structure repairs
Troy McDonald
"Palmer Technologies has provided professional refractory engineering services to BP Refinery (Bulwer Island) for the past several years."
+ Read Testimonial
Independent engineering and design for shutdowns
Cement Australia – Railton
The role of Palmer Technologies is to provide independent technical advice to Cement Australia specifically to prepare –
In 2007, a P-Lining® refractory design was installed on a vessel roof. Previously the refractory was failing every 6-12 months. The new design is performing beyond expectations and it is expected to have a life between 4-6 years based on current trends.
After winning the company's Excellence Award, the Railton Shutdown Manager said, "It is the best performance since the construction of the cyclone in 1980" and "our expectations are to get 3-5 year life out of the TAC roof refractory".
Garry Bissett
"Palmer Technologies palmertechgroup was selected to redesign the cyclone roof using a detailed engineering approach to refractory structures."
+ Read Testimonial
Independent engineering and design for shutdowns
Incitec Pivot Ltd/ Dyno Nobel – Gibson Island, Moranbah, Phosphate Hill
The role of Palmer Technologies is to provide independent technical advice to Incitec Pivot specifically to prepare –
Independent engineering and design for shutdowns
Ballance Agri-Nutrients NZ
The role of Palmer Technologies is to provide independent technical advice to Ballance specifically to prepare –