Palmer Technologies
  • Contact
  • Testimonials
  • Industries
  • Abstracts
  • About
  • Quality Control
  • Numerical Analysis
  • Heat Transfer
  • NDT
  • Refractory Design

TESTIMONIALS

"Palmer Technologies is very thorough and has all the
expertise required for aiding us in our major outages."

    • BP REFINERY BULWER ISLAND
    • CEMENT AUSTRALIA
    • WORSLEY ALUMINA
    • QUEENSLAND NITRATES
  • BP REFINERY BULWER ISLAND QNP

    Palmer Technologies has provided professional refractory engineering services to BP Refinery (Bulwer Island) for the past several years. Palmer Technologies' significant expertise in refractory structures has enabled the refinery to make more informed decisions on refractory condition, selection and design which has resulted in an overall improvement in asset availability.

    Testimonial Troy McDonald
    BP Refinery (Bulwer Island) Pty Ltd

    Back to Top

    Cement AustraliaQNP

    Palmer Technologies was selected to redesign the cyclone roof using a detailed engineering approach to refractory structures. After winning the company's Excellence Award, the Railton Shutdown Manager said, "It is the best performance since the construction of the cyclone in 1980" and "our expectations are to get 3-5 year life out of the TAC roof refractory". Palmer Technologies has been pivotal in assisting the plant at a professional level and providing the technical advice to solve complex refractory problems allowing the plant to improve refractory reliability.

    Testimonial Garry Bissett
    Planning & Shutdown Manager Cement Australia Pty Ltd

    Back to Top

    WORSLEY ALUMINA QNP

    Worsley Alumina (WA) has used Palmer Technologies for assessing the condition of their calciner refractory structures. Palmer Technologies provides a professional approach to refractory structures and their P-Response NDT testing is an important part of plant's vessel entry procedure and quality evaluation. Greg's personal knowledge of the industry coupled with his ability to use real life practical experiences in problem solving has added value in enabling us to achieve consistently safe and timely executions of scheduled Calciner Shutdowns at Worsley.

    Testimonial Gordon Brandis
    (WAPL)

    Back to Top

    Queensland NitratesQNP

    QNP has used Palmer Technologies for professional engineering services of refractories at the plant over the past decade. Palmer Technologies provides the necessary oversight and professionalism needed to manage refractory structures. We are happy to use Palmer Technologies in the future. Palmer Technologies is very thorough and has all the expertise required for aiding us in our major outages.

    Testimonial Peter Johnson
    Plant Integrity inspector, Queensland Nitrates Pty Ltd

    Back to Top

  • Contact Us

    Palmer Technologies welcome all inquiries. We're happy to answer any questions, or get in contact for future projects.

    TEL: +61 7 3852 4448

    FAX: +61 7 3852 4934

    + Contact Form

    About Palmer Technolgies

    Palmer Technologies has been delivering a professional engineering service to industry throughout Australia and New Zealand...

    + Read More
Palmer Tech
  • REFRACTORY DESIGN
  • NDT
  • HEAT TRANSFER
  • NUMERICAL ANALYSIS
  • QUALITY CONTROL
  • UserTESTIMONIALS

    "Palmer Technologies' significant expertise in refractory structures has enabled the refinery..."

  • About Palmer Tech ABOUT US

    Palmer Technologies has been delivering a professional engineering service to industry throughout Australia and New Zealand...

  • Contact Us CONTACT US

    Palmer Technologies welcome all inquiries. We're happy to answer any questions, or get in contact for future projects.

Legal Notice | Privacy Policy | Terms & Conditions
© Copyright 2011 Palmer Technologies Pty Ltd